The project implementation plan consists of 5 Work Packages as follows:
- WP1: THERMODYNAMIC ANALYSIS AND DESIGN OF PIPELINE NETWORK FOR CO2 TRANSPORTATION.
- Task 1.1: Development of a predictive model for pure CO2 and mixtures of CO2 with hydrocarbons and water and of hydrate formation.
- Task 1.2: Design of the pipeline network for the transportation of CO2.
- D1.1: A new predictive model for pure CO2 and mixtures of CO2 with other substances (M18)
- D1.2: A new predictive model for hydrate formation (M18)
- D1.3: Design of pipeline network for CO2 transportation (M22)
- WP2: MULTI-HAZARD RISK ANALYSIS
- Task 2.1: Landslide risk
- Task 2.2: Seismic risk
- Task 2.3: Corrosion risk
- Task 2.4: Design and construction error risk
- D2.1: Technical framework based on adequate algorithms for the landslides risk (M22)
- D2.2: Technical framework for the earthquake risk assessment standards (M20)
- D2.3: Determination of the CO2 streams composition oriented to typical Black Sea region located lignite fired power plants (M8)
- D2.4: Realization of corrosion test program with pipeline construction materials in supercritical CO2-water environments in the presence of different impurities (M18)
- D2.5: Development of mitigation strategy for corrosion protection of CO2 transport pipelines accounting for the CCS induced impurities (M22)
- D2.6: Report on pipeline design and construction risks (M22)
- WP3: Risk assessment guidelines
- D3.1: Risk assessment guidelines (M24)
- WP4: Dissemination
- Task 4.1: Workshop in Turkey (Month 6)
- Task 4.2 Workshop in Romania (Month 11)
- Task 4.3 Workshop in Athens (Month 16)
- Task 4.4 Workshop in Bulgaria (Month 21)
- Task 4.5 Seminar in Romania (Month 24) - A 2-days training for the Romanian national gas transmission company
- WP5: Coordination
- Task 5.1: Kick-off meeting in Athens
- Task 5.2: Intermediate project meeting in Athens (Month 16)
- Task 5.3: Final project meeting in Athens (Month 25)