CO2TRACCS Workpackages

The project implementation plan consists of 5 Work Packages as follows:

  1. WP1: THERMODYNAMIC ANALYSIS AND DESIGN OF PIPELINE NETWORK FOR CO2 TRANSPORTATION.
    1. Task 1.1: Development of a predictive model for pure CO2 and mixtures of CO2 with hydrocarbons and water and of hydrate formation.
    2. Task 1.2: Design of the pipeline network for the transportation of CO2.

    Deliverables/Milestones

    • D1.1: A new predictive model for pure CO2 and mixtures of CO2 with other substances (M18)
    • D1.2: A new predictive model for hydrate formation (M18)
    • D1.3: Design of pipeline network for CO2 transportation (M22)

  2. WP2: MULTI-HAZARD RISK ANALYSIS
    1. Task 2.1: Landslide risk
    2. Task 2.2: Seismic risk
    3. Task 2.3: Corrosion risk
    4. Task 2.4: Design and construction error risk

    Deliverables/Milestones

    • D2.1: Technical framework based on adequate algorithms for the landslides risk (M22)
    • D2.2: Technical framework for the earthquake risk assessment standards (M20)
    • D2.3: Determination of the CO2 streams composition oriented to typical Black Sea region located lignite fired power plants (M8)
    • D2.4: Realization of corrosion test program with pipeline construction materials in supercritical CO2-water environments in the presence of different impurities (M18)
    • D2.5: Development of mitigation strategy for corrosion protection of CO2 transport pipelines accounting for the CCS induced impurities (M22)
    • D2.6: Report on pipeline design and construction risks (M22)

  3. WP3: Risk assessment guidelines

  4. Deliverables/Milestones

    • D3.1: Risk assessment guidelines (M24)

  5. WP4: Dissemination
    1. Task 4.1: Workshop in Turkey (Month 6)
    2. Task 4.2 Workshop in Romania (Month 11)
    3. Task 4.3 Workshop in Athens (Month 16)
    4. Task 4.4 Workshop in Bulgaria (Month 21)
    5. Task 4.5 Seminar in Romania (Month 24) - A 2-days training for the Romanian national gas transmission company

  6. WP5: Coordination
    1. Task 5.1: Kick-off meeting in Athens
    2. Task 5.2: Intermediate project meeting in Athens (Month 16)
    3. Task 5.3: Final project meeting in Athens (Month 25)